09/05/2022 | JDA-IA/SAP-002/2022 | RFP – SAP FINANCE AND SCM PRE-IMPLEMENTATION AND DATA MIGRATION REVIEW APPLICATION CONTROLS REVIEWS FOR THE JDA BUS FACTORY FOR 3 MONTHS | Download
|
22/04/2022 | JDA OFBSW / CN004 | Orange Farm Bulk Stormwater in Ward 3 and 4 | Download
|
22/04/2022 | JDA OFTP / CN004 | Orange Farm Turnkey Projects (Chris Hani Complex) | Download
|
22/04/2022 | IPPEU /CN008 | Ivory Park PEU (Dlamini Drive) Project | Download
|
04/03/2022 | JDA_Matholesville/CN-PH2 | Construction of Matholesville Multipurpose Centre | Download
|
04/03/2022 | Construction of Bulk Stormwater Upgrades in Orange Farm ward 3 | Construction of Bulk Stormwater Upgrades in Orange Farm ward 3 | Download
|
04/03/2022 | Construction of Bulk Stormwater Upgrades in Orange Farm ward 4 | Construction of Bulk Stormwater Upgrades in Orange Farm ward 4 | Download
|
21/02/2022 | Rosebank Public Transport Facility | Rosebank Public Transport Facility | Download
|
15/02/2022 | JDA/CPC – TURNKEY PROGRAMME – IVORY PARK UDF REVIEW AND IMPLEMENTATION | PROVISION OF COMMUNITY PARTICIPATION CONSULTANT (CPC) PROFESSIONAL CONSULTANTS TO CONDUCT A SPATIAL REVIEW AND URBAN DESIGN PLANS FOR THE IVORY PARK TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | Download
|
11/02/2022 | Construction of Soweto Railway Stations NMT Links: Chiawelo | Construction of Soweto Railway Stations NMT Links: Chiawelo | Download
|
09/02/2022 | BACKGROUNDCHECK FOR 2 X DFP CANDIDATES FOR HR | BACKGROUNDCHECK FOR 2 X DFP CANDIDATES FOR HR | Download
|
04/02/2022 | RFP - SAP FINANCE AND SCM PRE-IMPLEMENTATION AND DATA MIGRATION REVIEW | RFP – SAP FINANCE AND SCM PRE-IMPLEMENTATION AND DATA MIGRATION REVIEW | Download
|
20/01/2022 | BUSINESS CONTINUITY MANAGEMENT | BUSINESS CONTINUITY MANAGEMENT | Download
|
14/12/2021 | PANEL RFQ - CONDUCT 4 X BACKGROUNDCHECK S FOR THE JDA | PANEL RFQ – CONDUCT 4 X BACKGROUNDCHECK S FOR THE JDA | Download
|
09/12/2021 | PANEL OF PUBLIC ART CURATORS FOR 36 MONTHS | PANEL OF PUBLIC ART CURATORS FOR 36 MONTHS | Download
|
09/12/2021 | PANEL OF PROFESSIONALS TO CURATE PLACE-MAKING, PUBLIC ART AND HERITAGE PROJECTS FOR THE JDA FOR 36 MONTHS | PANEL OF PROFESSIONALS TO CURATE PLACE-MAKING, PUBLIC ART AND HERITAGE PROJECTS FOR THE JDA FOR 36 MONTHS | Download
|
03/12/2021 | Eastern Gateway Precinct | Appointment of Professional Services for Eastern Gateway Precinct | Download
|
03/12/2021 | Central Fire Station | Appointment of Professional Services for Central Fire Station | Download
|
03/12/2021 | Alex Hospice | Appointment of Professional Services for Alex Hospice | Download
|
03/12/2021 | Turffontein Complete Street | Turffontein Complete Street | Download
|
03/12/2021 | Deep South Complete Street | Deep South Complete Street | Download
|
30/11/2021 | Johannesburg Art Gallery | Johannesburg Art Gallery | Download
|
24/11/2021 | URBAN PLANNERS FOR THE IVORY PARK TURNKEY PROJECT-SPATIAL REVIEW AND URBAN DESIGN PLANS FOR 36 MONTHS | PANEL RFQ – URBAN PLANNERS FOR THE IVORY PARK TURNKEY PROJECT-SPATIAL REVIEW AND URBAN DESIGN PLANS FOR 36 MONTHS | Download
|
24/11/2021 | URBAN PLANNERS FOR THE KLIPTOWN TURNKEY PROJECT-SPATIAL REVIEW AND URBAN DESIGN PLANS FOR 36 MONTHS | URBAN PLANNERS FOR THE KLIPTOWN TURNKEY PROJECT-SPATIAL REVIEW AND URBAN DESIGN PLANS FOR 36 MONTHS | Download
|
23/11/2021 | PROVISION OF TRANSPORT ENGINEER PROFESSIONAL CONSULTANT TO UNDERTAKE TRAFFIC IMPACT ASSESSMENTS FOR KLIPTOWN TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | PROVISION OF TRANSPORT ENGINEER PROFESSIONAL CONSULTANT TO UNDERTAKE TRAFFIC IMPACT ASSESSMENTS FOR KLIPTOWN TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | Download
|
22/11/2021 | Bertrams Multipurpose Centre | Construction of Bertrams Multipurpose Centre | Download
|
22/11/2021 | PROVISION OF ARCHITECTS/URBAN DESIGNER PROFESSIONAL CONSULTANTS TO CONDUCT A SPATIAL REVIEW AND URBAN DESIGN PLANS FOR THE IVORY PARK TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | PROVISION OF ARCHITECTS/URBAN DESIGNER PROFESSIONAL CONSULTANTS TO CONDUCT A SPATIAL REVIEW AND URBAN DESIGN PLANS FOR THE IVORY PARK TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | Download
|
22/11/2021 | PROVISION OF ARCHITECTS/URBAN DESIGNER PROFESSIONAL CONSULTANTS TO CONDUCT A SPATIAL REVIEW AND URBAN DESIGN PLANS FOR THE KLIPTOWN TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | PROVISION OF ARCHITECTS/URBAN DESIGNER PROFESSIONAL CONSULTANTS TO CONDUCT A SPATIAL REVIEW AND URBAN DESIGN PLANS FOR THE KLIPTOWN TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | Download
|
17/11/2021 | WATT STREET PRECINCT (WYNBERG) PUBLIC ENVIRONMENT UPGRADES | WATT STREET PRECINCT (WYNBERG) PUBLIC ENVIRONMENT UPGRADES | Download
|
23/11/2021 | PROVISION OF TRANSPORT ENGINEER PROFESSIONAL CONSULTANT TO UNDERTAKE TRAFFIC IMPACT ASSESSMENT FOR IVORY PARK TURNKEY PROJECT FOR THE JDA FOR FOR 36 MONTHS | PROVISION OF TRANSPORT ENGINEER PROFESSIONAL CONSULTANT TO UNDERTAKE TRAFFIC IMPACT ASSESSMENT FOR IVORY PARK TURNKEY PROJECT FOR THE JDA FOR FOR 36 MONTHS | Download
|
03/11/2021 | THE REA-VAYA BRT STATIONS PHASE 1C, SECTION 8&15: CONSTRUCTION OF BRT STATIONS, GUARDHOUSES, GANDHI PEU & CUSTOMER CARE CENTRES. JOHANNESBURG GAUTENG | THE REA-VAYA BRT STATIONS PHASE 1C, SECTION 8&15: CONSTRUCTION OF BRT STATIONS, GUARDHOUSES, GANDHI PEU & CUSTOMER CARE CENTRES. JOHANNESBURG GAUTENG | Download
|
10/09/2021 | Inner City Ranks Car Street | | Download
|
02/11/2021 | Braamfischerville Ext 12 Roads and Stormwater | Braamfischerville Ext 12 Roads and Stormwater | Download
|
02/11/2021 | OPENING REGISTER FOR THE REHABILITATION AND UPGRADE OF THE EASTERN STORMWATER CHANNEL IN ORANGE GROOVE | OPENING REGISTER FOR THE REHABILITATION AND UPGRADE OF THE EASTERN STORMWATER CHANNEL IN ORANGE GROOVE | Download
|
02/11/2021 | Yetta Nathan Community Centre | Yetta Nathan Community Centre | Download
|
20/10/2021 | Zola Emdeni Public Transport Facility | Community Participants Consultants | Download
|
20/10/2021 | BRIXTON SOCIAL CLUSTER ELECRTICAL AND MECHANICAL ENGINEERS | BRIXTON SOCIAL CLUSTER ELECRTICAL AND MECHANICAL ENGINEERS | Download
|
18/10/2021 | PANEL RFQ - ROOF REPAIRS FOR THE JDA BUS FACTORY | READVERTISEMENT – PANEL RFQ – ROOF REPAIRS FOR THE JDA BUS FACTORY | Download
|
11/10/2021 | PANEL RFQ - ROOF REPAIRS FOR THE BUS FACTORY | ROOF REPAIRS FOR THE JDA BUS FACTORY | Donwload
|
10/10/2021 | Construction of Turffontein Clinic | Construction of Turffontein Clinic | Download
|
10/10/2021 | Construction of Turffontein Clinic | Construction of Turffontein Clinic | Download
|
06/10/2021 | JDA/ RT15-2021/001/2021 | THE SUPPLY AND DELIVERY OF MOBILE COMMUNICATION SERVICES TO THE JDA FOR THE PERIOD 1 APRIL 2021 TO 31 MARCH 2026 | Download
|
06/10/2021 | SUPPLY OF MANAGED SECURITY SERVICES | RFP – SUPPLY OF MANAGED SECURITY SERVICES FOR THREE (3) YEARS | Download
|
06/10/2021 | JDAICT/MS/002/2021 | RFP: SUPPLY OF MANAGED SECURITY SERVICES FOR THREE (3) YEARS |
|
04/10/2021 | JDADFP/TDMP/001/2021 | REQUEST FOR PROPOSALS FROM A MULTI-DISCIPLINARY TEAM OF TRANSPORT PLANNERS, TRAFFIC ENGINEERS, TRANSPORT ECONOMICS, CLIMATE SPECIALIST AND COMMUNITY PARTICIPATION CONSULTANT TO DEVELOP AND MANAGE 3 YEAR TRAVEL DEMAND MANAGEMENT PROGRAM FOR THE CITY OF JOHANNESBURG | Download
|
27/09/2021 | JDADFP/SF- INDLELA YA BAFAZI/ 001/2021 | RFQ – Appoint a Social Facilitator Professional For the Women-Led Design & placemaking |
|
27/09/2021 | JDADFP/UD- INDLELA YA BAFAZI/ 002/2021 | RFQ – Appoint Urban Designer Architect for the Women-Led Design & Placemaking |
|
22/09/2021 | Shelters for GBV and Displaced People | Shelters for GBV and Displaced People | Download
|
22/09/2021 | Health Preparatory Projects | Health Preparatory Projects | Download
|
22/09/2021 | HIKHENSILE AND FREEDOM PARK CLINICS | HIKHENSILE AND FREEDOM PARK CLINICS | Download
|
22/09/2021 | Protea South Clinic | Protea South Clinic | Download
|
16/09/2021 | Deep South and Turffontein Complete Street OHS | Deep South and Turffontein Complete Street OHS | Download
|
16/09/2021 | Construction of Naledi Clinic | Construction of Naledi Clinic | Download
|
14/09/2021 | Project: Minor Works: Swimming Pools (Ellis Park, Orlando, Meadowlands And Diepkloof) | Project: Minor Works: Swimming Pools (Ellis Park, Orlando, Meadowlands And Diepkloof) | Download
|
10/09/2021 | Inner City Ranks Car Street | Inner City Ranks Carr Street | Download
|
10/09/2021 | Johannesburg Community Library | Johannesburg Community Library | Download
|
10/09/2021 | Lenasia CBD TOD | Lenasia CBD TOD | Download
|
10/09/2021 | Johannesburg Community Library | Johannesburg Community Library | Download
|
10/09/2021 | PANEL RFQ - RESPONSE HANDLING OF 2 X DF SPECIALIST AND 1 X FACILITIES OFFICER POSITIONS FOR THE JDA | PANEL RFQ – RESPONSE HANDLING OF 2 X DF SPECIALIST AND 1 X FACILITIES OFFICER POSITIONS FOR THE JDA | Download
|
10/09/2021 | Vlakfontein Zakariyya Park PTF | Vlakfontein Zakariyya Park PTF | Download
|
10/09/2021 | Orange Farm PTF | Orange Farm PTF | Download
|
09/09/2021 | APPOINTMENT OF CIVIL AND STRUCTURAL FOR MELVILLE AUCKLAND PARK | APPOINTMENT OF CIVIL AND STRUCTURAL FOR MELVILLE AUCKLAND PARK | Download
|
08/09/2021 | THE REA-VAYA BRT STATIONS PHASE 1C, SECTION 8&15: CONSTRUCTION OF BRT STATIONS, GUARDHOUSES, GANDHI PEU & CUSTOMER CARE CENTRES. JOHANNESBURG GAUTENG. | THE REA-VAYA BRT STATIONS PHASE 1C, SECTION 8&15: CONSTRUCTION OF BRT STATIONS, GUARDHOUSES, GANDHI PEU & CUSTOMER CARE CENTRES. JOHANNESBURG GAUTENG. | Download
|
07/09/2021 | BRT SELPBY DEPOT PHASE 2C Refurbishment of the Administration Building | BRT SELPBY DEPOT PHASE 2C Refurbishment of the Administration Building | Download
|
06/09/2021 | Jack Mincer Public Transport Facility | Jack Mincer Public Transport Facility | DOWNLOAD
|
02/09/2021 | Zola Emdeni Public Transport Facility | ELECTRICAL AND MECHANICAL ENGINEERS | Download
|
01/09/2021 | Orange Farm Vlakfontein | Orange Farm Vlakfontein | Download
|
01/09/2021 | Diepsloot Projects | Diepsloot Projects | Download
|
31/08/2021 | Johannesburg Art Gallery | Johannesburg Art Gallery | Download
|
31/08/2021 | Project: Roodepoort CDB TOD | Project: Roodepoort CDB TOD | Download
|
31/08/2021 | Multipurpose Centers | WORKPACKAGE 2 MULTIPURPOSE CENTRES (DRIEZIEK, IVORY PARK AND LEHAE) | Download
|
31/08/2021 | Ivory Park Environmental Upgrade | Ivory Park Environmental Upgrade | Download
|
31/08/2021 | Project: Roodepoort CDB TOD | Project: Roodepoort CDB TOD | Download
|
29/08/2021 | APPOINTMENT OF CIVIL AND STRUCTURAL FOR PENNYVILLE PRECINCT | APPOINTMENT OF CIVIL AND STRUCTURAL FOR PENNYVILLE PRECINCT | Download
|
27/08/2021 | Zola Emdeni Public Transport | Quantity Surveyors | Download
|
27/08/2021 | JDA_Matholesville/CN-PH2 | Construction of Matholesville Multipurpose Centre | Download
|
27/08/2021 | Zola Emdeni Public Transport Facility | Zola Emdeni Public Transport Facility | Download
|
27/08/2021 | Kaalfontein Multipurpose Centre | Kaalfontein Multipurpose Centre | Download
|
27/08/2021 | Gandhi Square East Precinct Phase 2 | Gandhi Square East Precinct Phase 2 | Download
|
27/08/2021 | Our City Our Block – 2 | Our City Our Block – 2 | Download
|
27/08/2021 | Balfour Park Precinct Development | Balfour Park Precinct Development | Download
|
25/08/2021 | Jabulani TOD Phase 5 and 7 | Jabulani TOD Phase 5 and 7 | Download
|
13/08/2021 | Johannesburg Art Gallery | Johannesburg Art Gallery | Download
|
11/08/2021 | JDA/SEC-NEWTOWN/21 | SECURITY SERVICES FOR THE NEWTOWN PRECINCT MAINLY MARY FITZGERALD SQUARE AND NEWTOWN PRECINCT PARK FOR 36 MONTHS | Download
|
03/08/2021 | Construction of Orlando NMT Project | Construction of Orlando NMT Project | Download
|
30/07/2021 | REVITILISATION OF VREDEDORP PAGEVIEW CIVIL AND STRUCTURAL | REVITILISATION OF VREDEDORP PAGEVIEW CIVIL AND STRUCTURAL | Download
|
26/07/2021 | Jack Mincer Public Transport Facility | Jack Mincer Public Transport Facility | DOWNLOAD
|
16/07/2021 | APPOINTMENT OF COMMUNITY PARTICIPANT CONSULTANT FOR RANDBURG | APPOINTMENT OF COMMUNITY PARTICIPANT CONSULTANT FOR RANDBURG | Download
|
14/07/2021 | PANEL RFQ - HIRE 1 X EVENTS COORDINATOR TEMP FOR MARKETING - 2 MONTHS DURATION | PANEL RFQ – HIRE 1 X EVENTS COORDINATOR TEMP FOR MARKETING – 2 MONTHS DURATION | Download
|
12/07/2021 | RFP - WEBMASTER, REDESIGN & HOSTING | RFP – WEBMASTER, REDESIGN & HOSTING FOR THE JDA FOR 36 MONTHS | Download
|
24/06/2021 | JAG/QS005 | Johannesburg Art Gallery – Discipline: Quantity Surveyor | Download
|
10/06/2021 | M2 HIGHWAY FINGER JOINTS REPLACEMENT WORKS PROJECT AND MODDERFONTEIN BRIDGE | M2 HIGHWAY FINGER JOINTS REPLACEMENT WORKS PROJECT AND MODDERFONTEIN BRIDGE | Download
|
09/06/2021 | RFP – PROVISION OF PEST CONTROL SERVICES FOR THE JDA | RFP – PROVISION OF PEST CONTROL SERVICES FOR THE JDA FOR A PERIOD OF THREE (3) YEARS | Download
|
09/06/2021 | ORLANDO NMT OCCUPATIONAL HEALTH AND SAFETY CONSULTANTS | ORLANDO NMT OCCUPATIONAL HEALTH AND SAFETY CONSULTANTS | Download
|
31/05/2021 | PANEL FRQ - PARKING STRESS CPC | PANEL FRQ – PARKING STRESS CPC | Download
|
31/05/2021 | SUPPLY, IMPLEMENTATION AND MAINTENANCE OF ERP SUPPORT SERVICES FOR JDA | SUPPLY, IMPLEMENTATION AND MAINTENANCE OF ERP SUPPORT SERVICES FOR JDA | Download
|
31/05/2021 | JDADPF/CPC-DATACOLLCTION/2021 | PANEL RFQ – APPOINT CPC FOR DATA COLLECTION IN THE SOUTHERN, BARA, BRUMA AND NORTHERN & GREAT WALK BRIDGE NODES FOR THE JDA FOR 6 MONTHS | Download
|
24/05/2021 | SUPPLY AND MAINTENANCE OF MIMECAST SERVICES FOR THE JDA | SUPPLY AND MAINTENANCE OF MIMECAST SERVICES FOR THE JDA | Download
|
21/05/2021 | RFP - PROJECT MANAGEMENT PROCESS REVIEW | PROJECT MANAGEMENT PROCESS REVIEW | Download
|
13/05/2021 | PANE RFQ - CIVIL - STRUCTURAL ENGINEERS - RANDBURG CBD PEU CATEGORY B | PANE RFQ – CIVIL – STRUCTURAL ENGINEERS – RANDBURG CBD PEU CATEGORY B | Download
|
07/05/2021 | | Construction of Superstops and Holding Facility in Kya Sands Main Contractor |
|
30/04/2021 | | Construction of Superstops and Park and Ride Facility in Tshepisong |
|
20/04/2021 | RFP - MEDIA PLACEMENT SERVICES FOR JDA | MEDIA PLACEMENT SERVICES FOR JDA | Download
|
12/04/2021 | PANEL RFQ - CLEANING AND GARDENING SERVICES | PANEL RFQ – CLEANING AND GARDENING SERVICES | Download
|
01/04/2021 | Geotechnical Service Provider for the Lehae MPC. | Geotechnical Service Provider for the Lehae MPC | Download
|
26/03/2021 | JDA-1726B7002-PH8 | Jabulani TOD PH8: Intermodal Facility | Download
|
25/03/2021 | | Civil Engineers: BRT Alexandra Depot Alternate Access Road |
|
17/03/2021 | JDADFP/TAC-URBAN/008/2021 | RFP APPOINTMENT OF CONSORTIUM OF MULTIDISCIPLINARY PROFESSIONAL TEAM FOR THE INNER CITY TACTICAL URBANISM PROJECT – 6 MONTHS DURATION |
|
12/03/2021 | JDADFP/ICM –ROODEPOORT/003/2021 | REQUEST FOR PROPOSALS FROM BIDDERS WITH EXPERTISE IN TRANSPORT PLANNING AND TRAFFIC ENGINEERING TO PREPARE A FEASIBLITY STUDY FOR THE INTRODUCTION OF AN INTEGRATED CORRIDOR MANAGEMENT APPROACH FOR THE ROODEPOORT- JOHANNESBURG INNER CITY CORRIDOR AND ROODEPOORT – RANDBURG CORRIDOR IN THE CITY OF JOHANNESBURG – 16 MONTHS | Download
|
04/03/2021 | Construction of Bulk Stormwater Upgrades in Ward 4 | Construction of Bulk Stormwater Upgrades in Ward 4 | Download
|
04/03/2021 | Construction of Bulk Stormwater Upgrades in Ward 3 | Construction of Bulk Stormwater Upgrades in Ward 3 | Download
|
03/03/2021 | PANEL FRQ - PARKING STRESS TRANSPORT ENGINEER | PANEL FRP – PARKING STRESS TRANSPORT ENGINEER | Download
|
23/02/2021 | Orlando NMT Community Participation Consultants | Orlando NMT Community Participation Consultants | Download
|
23/02/2021 | | Zola, Orange Farm and Vlakfontein PTF OHS Agents |
|
23/02/2021 | JDADPF/PHASE-2B.ICSM/002/2021 | RFP – APPOINTMENT OF A CONSORTIUM OR JOINT VENTURE OF PROFESSIONALS CONSISTING OF URBAN DESIGNERS, SPATIAL PLANNERS, GIS SPECIALISTS AND COMMUNITY-BASED SURVEYING/RESEARCH SPECIALISTS FOR THE IMPLEMENTATION OF PHASE 2B OF THE INNER-CITY SPATIAL MODEL |
|
23/02/2021 | JDADPF/PHASE-2B.ICSM/002/2021 | APPOINTMENT OF A CONSORTIUM OR JOINT VENTURE OF PROFESSIONALS CONSISTING OF URBAN DESIGNERS, SPATIAL PLANNERS, GIS SPECIALISTS AND COMMUNITY-BASED SURVEYING/RESEARCH SPECIALISTS FOR THE IMPLEMENTATION OF PHASE 2B OF THE INNER-CITY SPATIAL MODEL |
|
04/02/2021 | JDAIA/F-AUDIT/001/2021 | RFP – FORENSIC AUDIT SERVICES |
|
19/01/2021 | JDA/CLEAN-GARDEN /NEWTOWN /002/2020 | RFP – PROVISIONING OF CLEANING, GARDENING AND GENERAL AD-HOC SERVICES FOR THE NEWTOWN MARY FITZGERALD SQUARE AND NEWTOWN PARK FOR 3 YEARS |
|
17/12/2020 | JDA/RISK/BCM/002/2020 | RE- ADVERTISEMT OF RFQ: BUSINESS CONTINUITY MANAGEMENT SUPPORT FOR THE JDA |
|
11/12/2020 | JDA 17/19.1.1.A.6000555.1 | Eastern Gateway Oval Park |
|
11/12/2020 | | Design and Implementation Turffontein Complete Street: Civil Engineers |
|
11/12/2020 | | Design and Implementation Deep South Complete Street: Civil Engineers |
|
08/12/2020 | JDA/MARKT/AERIAL-PHOTO/ 004/2020 | RFP: PROVISION OF AERIAL, GROUND PHOTOGRAPHY AND VIDEO SERVICES FOR THE JDA OVER THREE (3) YEARS |
|
05/12/2020 | | Rosebank Public Transport Facility: Transport Specialists/Traffic Engineers |
|
03/12/2020 | JDA/DF/TMP-RANDBURG/002/2020 | RFP -REQUEST FOR PROPOSAL FROM A CONSORTIUM OR JOINT VENTURE WITH EXPERTISE IN TRANSPORT PLANNING AND TRAFFIC ENGINEERING, URBAN PLANNING AND COMMUNITY PARTICIPATION TO DEVELOP A TRANSPORT MASTERPLAN AND IMPLEMENTATION PLAN FOR THE RANDBURG CENTRAL BUSINESS DISTRICT |
|
30/11/2020 | JDA/AUDIT/001/2020 | REQUEST FOR QUOTATIONS: PRELIMINARY FACT FINDING INVESTIGATION |
|
19/11/2020 | JDA/LEGAL-CM/006/2020/21 | REQUEST FOR PROPOSALS FROM BIDDERS WITH EXPERTISE IN CONTRACT MANAGEMENT SYSTEMS AND DISPUTE RESOLUTION MECHANISM |
|
14/11/2020 | | Lois Botha Stormwater Masterplan Civil Engineers |
|
06/11/2020 | JDA/DF/SAFESPACES-HERITAGE/ARCHITECT/001/2020 | RFQ – PROVISIONING OF THE HERITAGE ARCHITECTURAL SERVICES FOR SAFE SPACE |
|
05/11/2020 | | Implementation of Soweto Railway Stations NMT Links Chiawelo: Civil and Structural Engineers |
|
05/11/2020 | | Rosebank Public Transport Facility: Civil and Structural Engineers |
|
02/11/2020 | | Rosebank Transport Facility: Architects/Urban Designers |
|
21/10/2020 | JDAICT/GPSUPPORT/003/2020 | RE – ADVERTISEMENT: RFQ FOR THE PROVISIONING OF GREAT PLAINS SUPPORT SERVICES FOR THE JDA FOR 12 MONTHS |
|
20/10/2020 | JDARFQ/HYGIENE/001/2020 | RFQ – PROVISION OF HYGIENE SERVICES FOR THE JDA – BUS FACTORY FOR 12 MONTHS |
|
20/10/2020 | JDA/ICT/ ACCESSORIES/ 001/2020 | RFQ FOR SUPPLY AND DELIVERY OF ICT ACCESSORIES FOR THE JDA |
|
16/10/2020 | JDADF/HILLBROWTIA/2020 | RFQ – HILLBROW TRANSPORT STUDY & TRAFFIC IMPACT ASSESSMENT |
|
12/10/2020 | DA/ICT-FAC/GEN-UPS/001/2020 | RFP – SUPPLY, DELIVERY,INSTALLATION AND MAINTENANCE OF THE BACK-UP GENERATOR AND SERVICING OF THE UPS AT THE JDA F0R 36 MONTHS |
|
10/10/2020 | JDA/ICT/ANTI VIRUS/002/2020 | RE – ADVERTISEMENT: RFQ FOR SUPPLY OF ANTI VIRUS RENEWAL SERVICES FOR THE JDA FOR 12 MONTHS JDA |
|
30/09/2020 | JDA 19.2.2.B7107 | Construction Of Roodepoort CBD Tod (Stage 2) |
|
30/09/2020 | JDA/IA/CYBER-SECURITY/001/2020 | RFP – PROVISIONING OF CYBER-SECURITY RISK AUDIT FOR THE JDA |
|
25/09/2020 | | Feasibility Study For The Brt Ivory Park- Sandton CBD And Ivory Park |
|
22/09/2020 | JDA/RISK/ VERIFICATION/001/2020 | RFQ – VERIFICATION OF EMPLOYEES AND BOARD MEMBER’S DECLARATION OF INTEREST FOR THE JDA |
|
22/09/2020 | JDA/RISK/ TRAINING – ANTI FRAUD/002/2020 | RFQ – FACILITATE TRAINING ON ANTI-FRAUD & ANTI-CORRUPTION AND ETHICS FOR THE JDA |
|
22/09/2020 | JDA/RISK/ TRAINING – ENTERPRISE-WIDE RISK MANAGEMENT (ERM) /003/2020 | RFQ – FACILITATE TRAINING ON ENTERPRISE RISK MANAGEMENT (ERM) FOR THE JDA |
|
22/09/2020 | | PANEL OF 7GB CONTRACTORS |
|
21/09/2020 | | PANEL OF 8CE CONTRACTORS |
|
18/09/2020 | | Panel of 7CE Contractors |
|
16/09/2020 | JDA CPC002 | Community Participation Consultants Panel Closing |
|
15/09/2020 | JDA/ICT/TIDYCABLES/002/2020 | RE – ADVERTISEMENT – RFQ – FOR THE SUPPLY OF MATERIAL FOR TIDYING AND LABELLING OF CABLES IN THE SERVER ROOM FOR THE JDA FOR 12 MONTHS |
|
11/09/2020 | JDA/ITC/ERP SUPPORT/001/2020 | RFQ – Provisioning Of ERP Support Services For The JDA For 12 Months |
|
24/08/2020 | JDADF/CLN&GRDN/NEWTOWN/002/2020 | RE ADVERTISEMENT – RFQ –PROVISIONING OF CLEANING, GARDENING AND AD-HOC SERVICES FOR NEWTOWN MAINLY MARY FITZGERALD SQUARE AND NEWTOWN PRECINCT PARK FOR 2 MONTHS |
|
12/08/2020 | JDA17.3.8.B.7033 | Construction of Naledi Clinic |
|
11/08/2020 | JDA GPE/FS/CN002 | Gandhi Precinct East Development: Upgrade Of Fox Street |
|
24/07/2020 | JDAICT/PENTEST/001/2020 | Provisioning Of Penetration Testing And Vulnerability Assessment Services For The JDA For 12months |
|
24/07/2020 | JDAF/BRANDED UNIFORM/001/2020 | RE–ADVERTISEMENT – RFQ – SUPPLY AND DELIVER OF BRANDED SECURITY AND CLEANER’S UNIFORM FOR THE JDA |
|
15/06/2020 | JDAICT/TEL0048/2020 | RFP: Provisioning Of Telephone Upgrade Services For Three (3) Years |
|
12/06/2020 | JDAICT/IS0047/2020 | RFP: Provisioning Of Integrated Internet Services For Three (3) Years |
|
11/06/2020 | | Soweto Stations NMT Chiawelo: Traffic Engineeers |
|
10/06/2020 | PEU /CN004 | Nodal Regeneration: Braamfontein P E U |
|
04/06/2020 | JDADF/LEGAL-SECTITLE/002/2020 | Re – Advertisement of RFQ – Legal Experts for Legal Advisory Services on the Sectional Title Programme |
|
03/06/2020 | | Complete Street: Turffontein |
|
26/04/2020 | | Stormwater Masterpaln Implementation: Civil Engineers |
|
23/04/2020 | DA/SAFETYEQUIP/2020 | Supply And Delivery Of Safety Equipment |
|
24/03/2020 | | Construction of Ivory Park Public Environment |
|
23/03/2020 | JDA 17/19.2.B 7020 PH2 | Prequalification: Diepsloot Public Environment Upgrade |
|
20/03/2020 | | Construction of Orlando NMT Phase 2 |
|
18/03/2020 | PEU – BRT – CCC SB/002 | RFQ: Construction Of Customer Care Centre, Security Booths, Joubert Street And Ghandi Square |
|
16/03/2020 | JDADF/LEGAL-SECTITLE/2020 | RFQ – Legal Advisory Services On The Sectional Title Programme |
|
11/03/2020 | JDADF/GHANDIMAP/2020 | RFQ: Ghandi Square East Mapping |
|
11/03/2020 | | RFQ: Panel- Town Planners For The Rezoning And Consolidation Of Erf 54-64 MatholesvilleFQ: Ghandi Square East Mapping |
|
05/03/2020 | | Construction of Three Taxi Park and Ride Facilities in Tshepisong |
|
17/02/2020 | | Appointment Of Main Contractor For Brixtonsocial Cluster Phase Two |
|
17/02/2020 | | BRT Customer Care Centres |
|
17/02/2020 | JDA/DFKYA001/2020 | RFQ: Appointment Of Professional Consultants To Conduct Supplementrary Studies For The Township Establishment & Rezoning Of Holding 13 Trevally Ah In Kya Sands Region A For The Development Of The Taxi Holding Facility |
|
02/02/2020 | JDA/DFKY/001/2020 | RFQ – Appointment Of A Town Planner For The KYA Sands To Conduct Supplementary Studies For The Township Establishment And Rezoning Of Holding 13 Trevallyn AH For The Development Of A Taxi Holding Facility |
|
20/01/2020 | | Stormwater Masterplan Implementation SMP |
|
02/12/2019 | DF/LAND0031/2019 | RFP APPOINTMENT OF PANEL PROFESSIONAL SERVICE PROVIDERS-LAND SURVEYORS – 3 YEARS |
|