08/07/2022 | 17/19.2.2.A.600454 | Upgrade of Randburg Public Environment | Download
|
08/07/2022 | JDA 21/22.12.4..50245 | Upgrade of Melville Park Precinct | Download
|
19/07/2022 | JDA/LRSU 2&U | Construction of Roads and Stormwater Upgrades in Lakeside Ext 2 and 8 | Download
|
18/07/2022 | JDA.20.2.2.B.70.19 | Construction of Pennyville Public Environment Upgrades | Download
|
08/07/2022 | JDA 17/19.1.1.A.600555 | Construction of Murray Park Library Phase 1 | Download
|
05/07/2022 | Project: Joburg Market | Project: Joburg Market | Download
|
24/06/2022 | Contract no.: 17.19.1.1.A.600955 | Inner City Core Upgrade of Goud Street | Download
|
22/06/2022 | Construction of Klipfontein View Wellness Centre - Quantity Surveyor | Construction of Klipfontein View Wellness Centre – Quantity Surveyor | DOWNLOAD
|
14/06/2022 | JDADFP/TE/ICM-PT/003/2022 | RE-ADVERTISEMENT- TRANSPORT ENGINEER TO OVERSEE THE IMPLEMENTATION OF FEASIBILITY STUDIES FOR THE INTRODUCTION OF AN INTEGRATED CORRIDOR MANAGEMENT APPROACH ON TWO PUBLIC TRANSPORT CORRIDORS IN THE CITY OF JOHANNESBURG FOR 12 MONTHS | Download
|
31/05/2022 | JDADFP/MUSEUM AND ART GALLERIES/R&M/002/2022 | PUBLIC ART PANEL RFQ: RESTORATION OF MUSEUM COLLECTIONS – JOBURG ART GALLERY AND TRANSPORT MUSEUM FOR THE COJ FOR 6 MONTHS | Download
|
30/05/2022 | JDAFAC/OHASA-002/2022 | OHASA CONSULTING SERVICES FOR JDA BUS FACTORY FOR 36 MONTHS | Download
|
27/05/2022 | Cosmo City Public Transport Facility Civil Engineers | Cosmo City Public Transport Facility Civil Engineers | Download
|
24/05/2022 | Refurbishment of the Admistration building for the Selby Depot Phase 2C | Refurbishment of the Admistration building for the Selby Depot Phase 2C | Download
|
19/05/2022 | OHS PANEL | OHS PANEL | Download
|
09/05/2022 | REPAIRS TO ELLIS PARK SWIMMING POOL FACILITY | REPAIRS TO ELLIS PARK SWIMMING POOL FACILITY | Download
|
09/05/2022 | RE-ADVERTISEMENT OF RFP - SAP FINANCE AND SCM PRE-IMPLEMENTATION AND DATA MIGRATION REVIEW APPLICATION CONTROLS REVIEWS – SAP SCM AND SAP FINANCE SYSTEMS FOR THE JDA BUS FACTORY FOR 3 MONTHS | RE-ADVERTISEMENT OF RFP – SAP FINANCE AND SCM PRE-IMPLEMENTATION AND DATA MIGRATION REVIEW APPLICATION CONTROLS REVIEWS – SAP SCM AND SAP FINANCE SYSTEMS FOR THE JDA BUS FACTORY FOR 3 MONTHS | Download
|
09/05/2022 | JDA-IA/SAP-002/2022 | RFP – SAP FINANCE AND SCM PRE-IMPLEMENTATION AND DATA MIGRATION REVIEW APPLICATION CONTROLS REVIEWS FOR THE JDA BUS FACTORY FOR 3 MONTHS | Download
|
25/04/2022 | JDADFP/TP-ARCH/PMP/2022 | PANEL RFQ: TOWN PLANNERS: DEVELOPMENT OF THE PARKING MANAGEMENT POLICY AND BYLAW FOR THE CITY OF JOHANNESBURG METROPOLITAN MUNICIPALITY 24 MONTHS | Download
|
22/04/2022 | JDA OFBSW / CN004 | Orange Farm Bulk Stormwater in Ward 3 and 4 | Download
|
22/04/2022 | JDA OFTP / CN004 | Orange Farm Turnkey Projects (Chris Hani Complex) | Download
|
22/04/2022 | IPPEU /CN008 | Ivory Park PEU (Dlamini Drive) Project | Download
|
12/04/2022 | JDADFP/LST-ARCH/CPC/2022 | PANEL RFQ – PROVISION OF A CPC FOR THE LENASIA SCHOLAR TRANSPORT FACILITY CONCEPT DESIGN PLANS FOR THE JDA FOR 36 MONTHS | Download
|
13/04/2022 | JDADFP/SUN-HILL-UP/CPC/2022 | PANEL RFQ – PROVISION OF CPC SUNNINGHILL PUBLIC TRANSPORT FACILITY- LAND PREPARATION AND COMMUNITY ENGAGEMENT FOR TE JDA FOR 24 MONTHS | Download
|
13/04/2022 | JDADFP/SUN-HILL-UP/CPC/2022 | PANEL RFQ: URBAN PLANNER FOR SUNNINGHILL PUBLIC TRANSPORT FACILITY: LAND PREPARATION AND COMMUNITY ENGAGEMENT 24 MONTHS | Download
|
12/04/2022 | JDADFP/LST-ARCH/CPC/2022 | PANEL RFQ – PROVISION OF AN ARCHITECT/URBAN DESIGNER FOR THE LENASIA SCHOLAR TRANSPORT FACILITY CONCEPT DESIGN PLANS FOR THE JDA FOR 36 MONTHS FOR THE JDA FOR 36 MONTHS | Download
|
01/04/2022 | APPOINTMENT OF MASINGITA CITY DEVELOPMENT ARCHITECTS | APPOINTMENT OF MASINGITA CITY DEVELOPMENT ARCHITECTS | DOWNLOAD
|
31/03/2022 | APPOINTMENT OF MASINGITA CITY DEVELOPMENT PROFESSIONAL TEAM | APPOINTMENT OF MASINGITA CITY DEVELOPMENT PROFESSIONAL TEAM | DOWNLOAD
|
30/03/2022 | APPOINTMENT OF PROFESSIONALS FOR WATT INTERCHANGE PRECINCT | APPOINTMENT OF PROFESSIONALS FOR WATT INTERCHANGE PRECINCT | DOWNLOAD
|
04/03/2022 | JDA_Matholesville/CN-PH2 | Construction of Matholesville Multipurpose Centre | Download
|
04/03/2022 | Construction of Bulk Stormwater Upgrades in Orange Farm ward 3 | Construction of Bulk Stormwater Upgrades in Orange Farm ward 3 | Download
|
04/03/2022 | Construction of Bulk Stormwater Upgrades in Orange Farm ward 4 | Construction of Bulk Stormwater Upgrades in Orange Farm ward 4 | Download
|
25/02/2022 | Appointment of Electrical Engineer for Randburg Public Environment Upgrades | Appointment of Electrical Engineer for Randburg Public Environment Upgrades | Download
|
25/02/2022 | Appointment of Electrical Engineer for Inner City Core | Appointment of Electrical Engineer for Inner City Core | DOWNLOAD
|
25/02/2022 | Appointment of Traffic Engineers for Randburg Public Environment Upgrades | Appointment of Traffic Engineers for Randburg Public Environment Upgrades | Download
|
25/02/2022 | Appointment of OHS for Inner City Core | Appointment of OHS for Inner City Core | DOWNLOAD
|
21/02/2022 | Rosebank Public Transport Facility | Rosebank Public Transport Facility | Download
|
15/02/2022 | JDA/CPC – TURNKEY PROGRAMME – IVORY PARK UDF REVIEW AND IMPLEMENTATION | PROVISION OF COMMUNITY PARTICIPATION CONSULTANT (CPC) PROFESSIONAL CONSULTANTS TO CONDUCT A SPATIAL REVIEW AND URBAN DESIGN PLANS FOR THE IVORY PARK TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | Download
|
15/02/2022 | JDA/CPC - KLIPTOWN TURNKEY PROGRAMME- UDF REVIEW AND IMPLEMENTATION | PANEL RFQ:PROVISION OF CPC TO CONDUCT A UDF REVIEW AND IMPLEMENTATION FOR THE KLIPTON TURNKEY PROGRAMME FOR THE JDA FOR 36 MONTHS | Download
|
11/02/2022 | Construction of Soweto Railway Stations NMT Links: Chiawelo | Construction of Soweto Railway Stations NMT Links: Chiawelo | Download
|
09/02/2022 | BACKGROUNDCHECK FOR 2 X DFP CANDIDATES FOR HR | BACKGROUNDCHECK FOR 2 X DFP CANDIDATES FOR HR | Download
|
04/02/2022 | RFP - SAP FINANCE AND SCM PRE-IMPLEMENTATION AND DATA MIGRATION REVIEW | RFP – SAP FINANCE AND SCM PRE-IMPLEMENTATION AND DATA MIGRATION REVIEW | Download
|
02/02/2022 | JDAFAC/HYGIENESERVICES/005/2022 | REQUEST FOR PROPOSALS FOR THE PROVISION OF HYGIENE SERVICES FOR THE JDA – BUS FACTORY FOR 36 MONTHS | Download
|
20/01/2022 | BUSINESS CONTINUITY MANAGEMENT | BUSINESS CONTINUITY MANAGEMENT | Download
|
14/12/2021 | PANEL RFQ - CONDUCT 4 X BACKGROUNDCHECK S FOR THE JDA | PANEL RFQ – CONDUCT 4 X BACKGROUNDCHECK S FOR THE JDA | Download
|
09/12/2021 | PANEL OF PUBLIC ART CURATORS FOR 36 MONTHS | PANEL OF PUBLIC ART CURATORS FOR 36 MONTHS | Download
|
09/12/2021 | PANEL OF PROFESSIONALS TO CURATE PLACE-MAKING, PUBLIC ART AND HERITAGE PROJECTS FOR THE JDA FOR 36 MONTHS | PANEL OF PROFESSIONALS TO CURATE PLACE-MAKING, PUBLIC ART AND HERITAGE PROJECTS FOR THE JDA FOR 36 MONTHS | Download
|
03/12/2021 | Eastern Gateway Precinct | Appointment of Professional Services for Eastern Gateway Precinct | Download
|
03/12/2021 | Central Fire Station | Appointment of Professional Services for Central Fire Station | Download
|
03/12/2021 | Alex Hospice | Appointment of Professional Services for Alex Hospice | Download
|
03/12/2021 | Turffontein Complete Street | Turffontein Complete Street | Download
|
03/12/2021 | Deep South Complete Street | Deep South Complete Street | Download
|
01/12/2021 | JDADFP/SAF-PHASE-1/007/2021 | PANEL RFQ: SOWETO STRATEGIC AREA FRAMEWORK AND IMPLEMENTATION PHASE 1 – FEASIBILITY AND DETAILED DESIGN CONCEPTS FOR KUMALO MAIN ROAD AND VILAKAZI STREET- ORLANDO WEST, SOWETO FOR THE JDA FOR 36 MONTHS | Download
|
01/12/2021 | JDADFP/SAF-PHASE-1/007/2021 | PANEL RFQ: SOWETO STRATEGIC AREA FRAMEWORK AND IMPLEMENTATION PHASE 1 – FEASIBILITY AND DETAILED DESIGN CONCEPTS FOR KUMALO MAIN ROAD AND VILAKAZI STREET- ORLANDO WEST, SOWETO FOR THE JDA FOR 36 MONTHS | Download
|
01/12/2021 | JDADFP/SAF-PHASE-1/007/2021 | PANEL RFQ: SOWETO STRATEGIC AREA FRAMEWORK AND IMPLEMENTATION PHASE 1 – FEASIBILITY AND DETAILED DESIGN CONCEPTS FOR KUMALO MAIN ROAD AND VILAKAZI STREET- ORLANDO WEST, SOWETO FOR THE JDA FOR 36 MONTHS | Download
|
30/11/2021 | Johannesburg Art Gallery | Johannesburg Art Gallery | Download
|
24/11/2021 | URBAN PLANNERS FOR THE IVORY PARK TURNKEY PROJECT-SPATIAL REVIEW AND URBAN DESIGN PLANS FOR 36 MONTHS | PANEL RFQ – URBAN PLANNERS FOR THE IVORY PARK TURNKEY PROJECT-SPATIAL REVIEW AND URBAN DESIGN PLANS FOR 36 MONTHS | Download
|
24/11/2021 | URBAN PLANNERS FOR THE KLIPTOWN TURNKEY PROJECT-SPATIAL REVIEW AND URBAN DESIGN PLANS FOR 36 MONTHS | URBAN PLANNERS FOR THE KLIPTOWN TURNKEY PROJECT-SPATIAL REVIEW AND URBAN DESIGN PLANS FOR 36 MONTHS | Download
|
23/11/2021 | PROVISION OF TRANSPORT ENGINEER PROFESSIONAL CONSULTANT TO UNDERTAKE TRAFFIC IMPACT ASSESSMENTS FOR KLIPTOWN TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | PROVISION OF TRANSPORT ENGINEER PROFESSIONAL CONSULTANT TO UNDERTAKE TRAFFIC IMPACT ASSESSMENTS FOR KLIPTOWN TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | Download
|
22/11/2021 | JDADPF/KLPTWN-TURNKEY-ARCH-URBAN PLNRS/002/2021 | PANEL RFQ: PROVISION OF ARCHITECTS PROFESSIONAL CONSULTANTS TO CONDUCT A SPATIAL REVIEW AND URBAN DESIGN PLANS FOR THE KLIPTON TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | Download
|
22/11/2021 | Bertrams Multipurpose Centre | Construction of Bertrams Multipurpose Centre | Download
|
22/11/2021 | PROVISION OF ARCHITECTS/URBAN DESIGNER PROFESSIONAL CONSULTANTS TO CONDUCT A SPATIAL REVIEW AND URBAN DESIGN PLANS FOR THE IVORY PARK TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | PROVISION OF ARCHITECTS/URBAN DESIGNER PROFESSIONAL CONSULTANTS TO CONDUCT A SPATIAL REVIEW AND URBAN DESIGN PLANS FOR THE IVORY PARK TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | Download
|
22/11/2021 | PROVISION OF ARCHITECTS/URBAN DESIGNER PROFESSIONAL CONSULTANTS TO CONDUCT A SPATIAL REVIEW AND URBAN DESIGN PLANS FOR THE KLIPTOWN TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | PROVISION OF ARCHITECTS/URBAN DESIGNER PROFESSIONAL CONSULTANTS TO CONDUCT A SPATIAL REVIEW AND URBAN DESIGN PLANS FOR THE KLIPTOWN TURNKEY PROJECT FOR THE JDA FOR 36 MONTHS | Download
|
05/11/2021 | REHABILITATION AND UPGRADE OF THE EASTERN STORMWATER CHANNEL IN ORANGE GROOVE | REHABILITATION AND UPGRADE OF THE EASTERN STORMWATER CHANNEL IN ORANGE GROOVE | Download
|
17/11/2021 | WATT STREET PRECINCT (WYNBERG) PUBLIC ENVIRONMENT UPGRADES | WATT STREET PRECINCT (WYNBERG) PUBLIC ENVIRONMENT UPGRADES | Download
|
23/11/2021 | PROVISION OF TRANSPORT ENGINEER PROFESSIONAL CONSULTANT TO UNDERTAKE TRAFFIC IMPACT ASSESSMENT FOR IVORY PARK TURNKEY PROJECT FOR THE JDA FOR FOR 36 MONTHS | PROVISION OF TRANSPORT ENGINEER PROFESSIONAL CONSULTANT TO UNDERTAKE TRAFFIC IMPACT ASSESSMENT FOR IVORY PARK TURNKEY PROJECT FOR THE JDA FOR FOR 36 MONTHS | Download
|
03/11/2021 | THE REA-VAYA BRT STATIONS PHASE 1C, SECTION 8&15: CONSTRUCTION OF BRT STATIONS, GUARDHOUSES, GANDHI PEU & CUSTOMER CARE CENTRES. JOHANNESBURG GAUTENG | THE REA-VAYA BRT STATIONS PHASE 1C, SECTION 8&15: CONSTRUCTION OF BRT STATIONS, GUARDHOUSES, GANDHI PEU & CUSTOMER CARE CENTRES. JOHANNESBURG GAUTENG | Download
|
10/09/2021 | Inner City Ranks Car Street | | Download
|
02/11/2021 | Braamfischerville Ext 12 Roads and Stormwater | Braamfischerville Ext 12 Roads and Stormwater | Download
|
02/11/2021 | OPENING REGISTER FOR THE REHABILITATION AND UPGRADE OF THE EASTERN STORMWATER CHANNEL IN ORANGE GROOVE | OPENING REGISTER FOR THE REHABILITATION AND UPGRADE OF THE EASTERN STORMWATER CHANNEL IN ORANGE GROOVE | Download
|
02/11/2021 | Yetta Nathan Community Centre | Yetta Nathan Community Centre | Download
|
20/10/2021 | Zola Emdeni Public Transport Facility | Community Participants Consultants | Download
|
20/10/2021 | BRIXTON SOCIAL CLUSTER ELECRTICAL AND MECHANICAL ENGINEERS | BRIXTON SOCIAL CLUSTER ELECRTICAL AND MECHANICAL ENGINEERS | Download
|
18/10/2021 | PANEL RFQ - ROOF REPAIRS FOR THE JDA BUS FACTORY | READVERTISEMENT – PANEL RFQ – ROOF REPAIRS FOR THE JDA BUS FACTORY | Download
|
11/10/2021 | PANEL RFQ - ROOF REPAIRS FOR THE BUS FACTORY | ROOF REPAIRS FOR THE JDA BUS FACTORY | Donwload
|
10/10/2021 | Construction of Turffontein Clinic | Construction of Turffontein Clinic | Download
|
10/10/2021 | Construction of Turffontein Clinic | Construction of Turffontein Clinic | Download
|
06/10/2021 | JDA/ RT15-2021/001/2021 | THE SUPPLY AND DELIVERY OF MOBILE COMMUNICATION SERVICES TO THE JDA FOR THE PERIOD 1 APRIL 2021 TO 31 MARCH 2026 | Download
|
06/10/2021 | SUPPLY OF MANAGED SECURITY SERVICES | RFP – SUPPLY OF MANAGED SECURITY SERVICES FOR THREE (3) YEARS | Download
|
06/10/2021 | JDAICT/MS/002/2021 | RFP: SUPPLY OF MANAGED SECURITY SERVICES FOR THREE (3) YEARS |
|
04/10/2021 | JDADFP/TDMP/001/2021 | REQUEST FOR PROPOSALS FROM A MULTI-DISCIPLINARY TEAM OF TRANSPORT PLANNERS, TRAFFIC ENGINEERS, TRANSPORT ECONOMICS, CLIMATE SPECIALIST AND COMMUNITY PARTICIPATION CONSULTANT TO DEVELOP AND MANAGE 3 YEAR TRAVEL DEMAND MANAGEMENT PROGRAM FOR THE CITY OF JOHANNESBURG | Download
|
27/09/2021 | JDADFP/SF- INDLELA YA BAFAZI/ 001/2021 | RFQ – Appoint a Social Facilitator Professional For the Women-Led Design & placemaking |
|
27/09/2021 | JDADFP/UD- INDLELA YA BAFAZI/ 002/2021 | RFQ – Appoint Urban Designer Architect for the Women-Led Design & Placemaking |
|
22/09/2021 | Shelters for GBV and Displaced People | Shelters for GBV and Displaced People | Download
|
22/09/2021 | Health Preparatory Projects | Health Preparatory Projects | Download
|
22/09/2021 | HIKHENSILE AND FREEDOM PARK CLINICS | HIKHENSILE AND FREEDOM PARK CLINICS | Download
|
22/09/2021 | Protea South Clinic | Protea South Clinic | Download
|
16/09/2021 | Deep South and Turffontein Complete Street OHS | Deep South and Turffontein Complete Street OHS | Download
|
16/09/2021 | Construction of Naledi Clinic | Construction of Naledi Clinic | Download
|
14/09/2021 | Project: Minor Works: Swimming Pools (Ellis Park, Orlando, Meadowlands And Diepkloof) | Project: Minor Works: Swimming Pools (Ellis Park, Orlando, Meadowlands And Diepkloof) | Download
|
10/09/2021 | Inner City Ranks Car Street | Inner City Ranks Carr Street | Download
|
10/09/2021 | Johannesburg Community Library | Johannesburg Community Library | Download
|
10/09/2021 | Lenasia CBD TOD | Lenasia CBD TOD | Download
|
10/09/2021 | Johannesburg Community Library | Johannesburg Community Library | Download
|
10/09/2021 | PANEL RFQ - RESPONSE HANDLING OF 2 X DF SPECIALIST AND 1 X FACILITIES OFFICER POSITIONS FOR THE JDA | PANEL RFQ – RESPONSE HANDLING OF 2 X DF SPECIALIST AND 1 X FACILITIES OFFICER POSITIONS FOR THE JDA | Download
|
10/09/2021 | Vlakfontein Zakariyya Park PTF | Vlakfontein Zakariyya Park PTF | Download
|
10/09/2021 | Orange Farm PTF | Orange Farm PTF | Download
|
09/09/2021 | APPOINTMENT OF CIVIL AND STRUCTURAL FOR MELVILLE AUCKLAND PARK | APPOINTMENT OF CIVIL AND STRUCTURAL FOR MELVILLE AUCKLAND PARK | Download
|
08/09/2021 | THE REA-VAYA BRT STATIONS PHASE 1C, SECTION 8&15: CONSTRUCTION OF BRT STATIONS, GUARDHOUSES, GANDHI PEU & CUSTOMER CARE CENTRES. JOHANNESBURG GAUTENG. | THE REA-VAYA BRT STATIONS PHASE 1C, SECTION 8&15: CONSTRUCTION OF BRT STATIONS, GUARDHOUSES, GANDHI PEU & CUSTOMER CARE CENTRES. JOHANNESBURG GAUTENG. | Download
|
07/09/2021 | BRT SELPBY DEPOT PHASE 2C Refurbishment of the Administration Building | BRT SELPBY DEPOT PHASE 2C Refurbishment of the Administration Building | Download
|
06/09/2021 | Jack Mincer Public Transport Facility | Jack Mincer Public Transport Facility | DOWNLOAD
|
02/09/2021 | Zola Emdeni Public Transport Facility | ELECTRICAL AND MECHANICAL ENGINEERS | Download
|
01/09/2021 | Orange Farm Vlakfontein | Orange Farm Vlakfontein | Download
|
01/09/2021 | Diepsloot Projects | Diepsloot Projects | Download
|
31/08/2021 | Johannesburg Art Gallery | Johannesburg Art Gallery | Download
|
31/08/2021 | Project: Roodepoort CDB TOD | Project: Roodepoort CDB TOD | Download
|
31/08/2021 | Multipurpose Centers | WORKPACKAGE 2 MULTIPURPOSE CENTRES (DRIEZIEK, IVORY PARK AND LEHAE) | Download
|
31/08/2021 | Ivory Park Environmental Upgrade | Ivory Park Environmental Upgrade | Download
|
31/08/2021 | Project: Roodepoort CDB TOD | Project: Roodepoort CDB TOD | Download
|
29/08/2021 | APPOINTMENT OF CIVIL AND STRUCTURAL FOR PENNYVILLE PRECINCT | APPOINTMENT OF CIVIL AND STRUCTURAL FOR PENNYVILLE PRECINCT | Download
|
27/08/2021 | Zola Emdeni Public Transport | Quantity Surveyors | Download
|
27/08/2021 | JDA_Matholesville/CN-PH2 | Construction of Matholesville Multipurpose Centre | Download
|
27/08/2021 | Zola Emdeni Public Transport Facility | Zola Emdeni Public Transport Facility | Download
|
27/08/2021 | Kaalfontein Multipurpose Centre | Kaalfontein Multipurpose Centre | Download
|
27/08/2021 | Gandhi Square East Precinct Phase 2 | Gandhi Square East Precinct Phase 2 | Download
|
27/08/2021 | Our City Our Block – 2 | Our City Our Block – 2 | Download
|
27/08/2021 | Balfour Park Precinct Development | Balfour Park Precinct Development | Download
|
25/08/2021 | Jabulani TOD Phase 5 and 7 | Jabulani TOD Phase 5 and 7 | Download
|
13/08/2021 | Johannesburg Art Gallery | Johannesburg Art Gallery | Download
|
11/08/2021 | JDA/SEC-NEWTOWN/21 | SECURITY SERVICES FOR THE NEWTOWN PRECINCT MAINLY MARY FITZGERALD SQUARE AND NEWTOWN PRECINCT PARK FOR 36 MONTHS | Download
|
10/08/2021 | JDA/FAC/FIRE-COMP/21 | REQUEST FOR PROPOSALS FOR THE PROVISION OF FIRE COMPLIANCE AUDIT, ASSESSMENT AND DEVELOPMENT OF FIRE SAFETY SOP FOR THE JDA – BUS FACTORY FOR 36 MONTHS | Download
|
03/08/2021 | Construction of Orlando NMT Project | Construction of Orlando NMT Project | Download
|
30/07/2021 | REVITILISATION OF VREDEDORP PAGEVIEW CIVIL AND STRUCTURAL | REVITILISATION OF VREDEDORP PAGEVIEW CIVIL AND STRUCTURAL | Download
|
26/07/2021 | Jack Mincer Public Transport Facility | Jack Mincer Public Transport Facility | DOWNLOAD
|
16/07/2021 | APPOINTMENT OF COMMUNITY PARTICIPANT CONSULTANT FOR RANDBURG | APPOINTMENT OF COMMUNITY PARTICIPANT CONSULTANT FOR RANDBURG | Download
|
14/07/2021 | PANEL RFQ - HIRE 1 X EVENTS COORDINATOR TEMP FOR MARKETING - 2 MONTHS DURATION | PANEL RFQ – HIRE 1 X EVENTS COORDINATOR TEMP FOR MARKETING – 2 MONTHS DURATION | Download
|
12/07/2021 | RFP - WEBMASTER, REDESIGN & HOSTING | RFP – WEBMASTER, REDESIGN & HOSTING FOR THE JDA FOR 36 MONTHS | Download
|
24/06/2021 | JAG/QS005 | Johannesburg Art Gallery – Discipline: Quantity Surveyor | Download
|
10/06/2021 | M2 HIGHWAY FINGER JOINTS REPLACEMENT WORKS PROJECT AND MODDERFONTEIN BRIDGE | M2 HIGHWAY FINGER JOINTS REPLACEMENT WORKS PROJECT AND MODDERFONTEIN BRIDGE | Download
|
09/06/2021 | RFP – PROVISION OF PEST CONTROL SERVICES FOR THE JDA | RFP – PROVISION OF PEST CONTROL SERVICES FOR THE JDA FOR A PERIOD OF THREE (3) YEARS | Download
|
09/06/2021 | ORLANDO NMT OCCUPATIONAL HEALTH AND SAFETY CONSULTANTS | ORLANDO NMT OCCUPATIONAL HEALTH AND SAFETY CONSULTANTS | Download
|
31/05/2021 | PANEL FRQ - PARKING STRESS CPC | PANEL FRQ – PARKING STRESS CPC | Download
|
31/05/2021 | SUPPLY, IMPLEMENTATION AND MAINTENANCE OF ERP SUPPORT SERVICES FOR JDA | SUPPLY, IMPLEMENTATION AND MAINTENANCE OF ERP SUPPORT SERVICES FOR JDA | Download
|
31/05/2021 | JDADPF/CPC-DATACOLLCTION/2021 | PANEL RFQ – APPOINT CPC FOR DATA COLLECTION IN THE SOUTHERN, BARA, BRUMA AND NORTHERN & GREAT WALK BRIDGE NODES FOR THE JDA FOR 6 MONTHS | Download
|
24/05/2021 | SUPPLY AND MAINTENANCE OF MIMECAST SERVICES FOR THE JDA | SUPPLY AND MAINTENANCE OF MIMECAST SERVICES FOR THE JDA | Download
|
21/05/2021 | RFP - PROJECT MANAGEMENT PROCESS REVIEW | PROJECT MANAGEMENT PROCESS REVIEW | Download
|
13/05/2021 | PANE RFQ - CIVIL - STRUCTURAL ENGINEERS - RANDBURG CBD PEU CATEGORY B | PANE RFQ – CIVIL – STRUCTURAL ENGINEERS – RANDBURG CBD PEU CATEGORY B | Download
|
07/05/2021 | | Construction of Superstops and Holding Facility in Kya Sands Main Contractor |
|
30/04/2021 | | Construction of Superstops and Park and Ride Facility in Tshepisong |
|
20/04/2021 | RFP - MEDIA PLACEMENT SERVICES FOR JDA | MEDIA PLACEMENT SERVICES FOR JDA | Download
|
12/04/2021 | PANEL RFQ - CLEANING AND GARDENING SERVICES | PANEL RFQ – CLEANING AND GARDENING SERVICES | Download
|
01/04/2021 | Geotechnical Service Provider for the Lehae MPC. | Geotechnical Service Provider for the Lehae MPC | Download
|
26/03/2021 | JDA-1726B7002-PH8 | Jabulani TOD PH8: Intermodal Facility | Download
|
25/03/2021 | | Civil Engineers: BRT Alexandra Depot Alternate Access Road |
|
17/03/2021 | JDADFP/TAC-URBAN/008/2021 | RFP APPOINTMENT OF CONSORTIUM OF MULTIDISCIPLINARY PROFESSIONAL TEAM FOR THE INNER CITY TACTICAL URBANISM PROJECT – 6 MONTHS DURATION |
|
12/03/2021 | JDADFP/ICM –ROODEPOORT/003/2021 | REQUEST FOR PROPOSALS FROM BIDDERS WITH EXPERTISE IN TRANSPORT PLANNING AND TRAFFIC ENGINEERING TO PREPARE A FEASIBLITY STUDY FOR THE INTRODUCTION OF AN INTEGRATED CORRIDOR MANAGEMENT APPROACH FOR THE ROODEPOORT- JOHANNESBURG INNER CITY CORRIDOR AND ROODEPOORT – RANDBURG CORRIDOR IN THE CITY OF JOHANNESBURG – 16 MONTHS | Download
|
04/03/2021 | Construction of Bulk Stormwater Upgrades in Ward 4 | Construction of Bulk Stormwater Upgrades in Ward 4 | Download
|
04/03/2021 | Construction of Bulk Stormwater Upgrades in Ward 3 | Construction of Bulk Stormwater Upgrades in Ward 3 | Download
|
03/03/2021 | PANEL FRQ - PARKING STRESS TRANSPORT ENGINEER | PANEL FRP – PARKING STRESS TRANSPORT ENGINEER | Download
|
23/02/2021 | Orlando NMT Community Participation Consultants | Orlando NMT Community Participation Consultants | Download
|
23/02/2021 | | Zola, Orange Farm and Vlakfontein PTF OHS Agents |
|
23/02/2021 | JDADPF/PHASE-2B.ICSM/002/2021 | RFP – APPOINTMENT OF A CONSORTIUM OR JOINT VENTURE OF PROFESSIONALS CONSISTING OF URBAN DESIGNERS, SPATIAL PLANNERS, GIS SPECIALISTS AND COMMUNITY-BASED SURVEYING/RESEARCH SPECIALISTS FOR THE IMPLEMENTATION OF PHASE 2B OF THE INNER-CITY SPATIAL MODEL |
|
23/02/2021 | JDADPF/PHASE-2B.ICSM/002/2021 | APPOINTMENT OF A CONSORTIUM OR JOINT VENTURE OF PROFESSIONALS CONSISTING OF URBAN DESIGNERS, SPATIAL PLANNERS, GIS SPECIALISTS AND COMMUNITY-BASED SURVEYING/RESEARCH SPECIALISTS FOR THE IMPLEMENTATION OF PHASE 2B OF THE INNER-CITY SPATIAL MODEL |
|
04/02/2021 | JDAIA/F-AUDIT/001/2021 | RFP – FORENSIC AUDIT SERVICES |
|
19/01/2021 | JDA/CLEAN-GARDEN /NEWTOWN /002/2020 | RFP – PROVISIONING OF CLEANING, GARDENING AND GENERAL AD-HOC SERVICES FOR THE NEWTOWN MARY FITZGERALD SQUARE AND NEWTOWN PARK FOR 3 YEARS |
|
17/12/2020 | JDA/RISK/BCM/002/2020 | RE- ADVERTISEMT OF RFQ: BUSINESS CONTINUITY MANAGEMENT SUPPORT FOR THE JDA |
|
11/12/2020 | JDA 17/19.1.1.A.6000555.1 | Eastern Gateway Oval Park |
|
11/12/2020 | | Design and Implementation Turffontein Complete Street: Civil Engineers |
|
11/12/2020 | | Design and Implementation Deep South Complete Street: Civil Engineers |
|
08/12/2020 | JDA/MARKT/AERIAL-PHOTO/ 004/2020 | RFP: PROVISION OF AERIAL, GROUND PHOTOGRAPHY AND VIDEO SERVICES FOR THE JDA OVER THREE (3) YEARS |
|
05/12/2020 | | Rosebank Public Transport Facility: Transport Specialists/Traffic Engineers |
|
03/12/2020 | JDA/DF/TMP-RANDBURG/002/2020 | RFP -REQUEST FOR PROPOSAL FROM A CONSORTIUM OR JOINT VENTURE WITH EXPERTISE IN TRANSPORT PLANNING AND TRAFFIC ENGINEERING, URBAN PLANNING AND COMMUNITY PARTICIPATION TO DEVELOP A TRANSPORT MASTERPLAN AND IMPLEMENTATION PLAN FOR THE RANDBURG CENTRAL BUSINESS DISTRICT |
|
30/11/2020 | JDA/AUDIT/001/2020 | REQUEST FOR QUOTATIONS: PRELIMINARY FACT FINDING INVESTIGATION |
|
19/11/2020 | JDA/LEGAL-CM/006/2020/21 | REQUEST FOR PROPOSALS FROM BIDDERS WITH EXPERTISE IN CONTRACT MANAGEMENT SYSTEMS AND DISPUTE RESOLUTION MECHANISM |
|
14/11/2020 | | Lois Botha Stormwater Masterplan Civil Engineers |
|
06/11/2020 | JDA/DF/SAFESPACES-HERITAGE/ARCHITECT/001/2020 | RFQ – PROVISIONING OF THE HERITAGE ARCHITECTURAL SERVICES FOR SAFE SPACE |
|
05/11/2020 | | Implementation of Soweto Railway Stations NMT Links Chiawelo: Civil and Structural Engineers |
|
05/11/2020 | | Rosebank Public Transport Facility: Civil and Structural Engineers |
|
02/11/2020 | | Rosebank Transport Facility: Architects/Urban Designers |
|
21/10/2020 | JDAICT/GPSUPPORT/003/2020 | RE – ADVERTISEMENT: RFQ FOR THE PROVISIONING OF GREAT PLAINS SUPPORT SERVICES FOR THE JDA FOR 12 MONTHS |
|
20/10/2020 | JDARFQ/HYGIENE/001/2020 | RFQ – PROVISION OF HYGIENE SERVICES FOR THE JDA – BUS FACTORY FOR 12 MONTHS |
|
20/10/2020 | JDA/ICT/ ACCESSORIES/ 001/2020 | RFQ FOR SUPPLY AND DELIVERY OF ICT ACCESSORIES FOR THE JDA |
|
16/10/2020 | JDADF/HILLBROWTIA/2020 | RFQ – HILLBROW TRANSPORT STUDY & TRAFFIC IMPACT ASSESSMENT |
|
12/10/2020 | DA/ICT-FAC/GEN-UPS/001/2020 | RFP – SUPPLY, DELIVERY,INSTALLATION AND MAINTENANCE OF THE BACK-UP GENERATOR AND SERVICING OF THE UPS AT THE JDA F0R 36 MONTHS |
|
10/10/2020 | JDA/ICT/ANTI VIRUS/002/2020 | RE – ADVERTISEMENT: RFQ FOR SUPPLY OF ANTI VIRUS RENEWAL SERVICES FOR THE JDA FOR 12 MONTHS JDA |
|
30/09/2020 | JDA 19.2.2.B7107 | Construction Of Roodepoort CBD Tod (Stage 2) |
|
30/09/2020 | JDA/IA/CYBER-SECURITY/001/2020 | RFP – PROVISIONING OF CYBER-SECURITY RISK AUDIT FOR THE JDA |
|
25/09/2020 | | Feasibility Study For The Brt Ivory Park- Sandton CBD And Ivory Park |
|
22/09/2020 | JDA/RISK/ VERIFICATION/001/2020 | RFQ – VERIFICATION OF EMPLOYEES AND BOARD MEMBER’S DECLARATION OF INTEREST FOR THE JDA |
|
22/09/2020 | JDA/RISK/ TRAINING – ANTI FRAUD/002/2020 | RFQ – FACILITATE TRAINING ON ANTI-FRAUD & ANTI-CORRUPTION AND ETHICS FOR THE JDA |
|
22/09/2020 | JDA/RISK/ TRAINING – ENTERPRISE-WIDE RISK MANAGEMENT (ERM) /003/2020 | RFQ – FACILITATE TRAINING ON ENTERPRISE RISK MANAGEMENT (ERM) FOR THE JDA |
|
22/09/2020 | | PANEL OF 7GB CONTRACTORS |
|
21/09/2020 | | PANEL OF 8CE CONTRACTORS |
|
18/09/2020 | | Panel of 7CE Contractors |
|
16/09/2020 | JDA CPC002 | Community Participation Consultants Panel Closing |
|
15/09/2020 | JDA/ICT/TIDYCABLES/002/2020 | RE – ADVERTISEMENT – RFQ – FOR THE SUPPLY OF MATERIAL FOR TIDYING AND LABELLING OF CABLES IN THE SERVER ROOM FOR THE JDA FOR 12 MONTHS |
|
11/09/2020 | JDA/ITC/ERP SUPPORT/001/2020 | RFQ – Provisioning Of ERP Support Services For The JDA For 12 Months |
|
24/08/2020 | JDADF/CLN&GRDN/NEWTOWN/002/2020 | RE ADVERTISEMENT – RFQ –PROVISIONING OF CLEANING, GARDENING AND AD-HOC SERVICES FOR NEWTOWN MAINLY MARY FITZGERALD SQUARE AND NEWTOWN PRECINCT PARK FOR 2 MONTHS |
|
12/08/2020 | JDA17.3.8.B.7033 | Construction of Naledi Clinic |
|
11/08/2020 | JDA GPE/FS/CN002 | Gandhi Precinct East Development: Upgrade Of Fox Street |
|
24/07/2020 | JDAICT/PENTEST/001/2020 | Provisioning Of Penetration Testing And Vulnerability Assessment Services For The JDA For 12months |
|
24/07/2020 | JDAF/BRANDED UNIFORM/001/2020 | RE–ADVERTISEMENT – RFQ – SUPPLY AND DELIVER OF BRANDED SECURITY AND CLEANER’S UNIFORM FOR THE JDA |
|
15/06/2020 | JDAICT/TEL0048/2020 | RFP: Provisioning Of Telephone Upgrade Services For Three (3) Years |
|
12/06/2020 | JDAICT/IS0047/2020 | RFP: Provisioning Of Integrated Internet Services For Three (3) Years |
|
11/06/2020 | | Soweto Stations NMT Chiawelo: Traffic Engineeers |
|
10/06/2020 | PEU /CN004 | Nodal Regeneration: Braamfontein P E U |
|
04/06/2020 | JDADF/LEGAL-SECTITLE/002/2020 | Re – Advertisement of RFQ – Legal Experts for Legal Advisory Services on the Sectional Title Programme |
|
03/06/2020 | | Complete Street: Turffontein |
|
26/04/2020 | | Stormwater Masterpaln Implementation: Civil Engineers |
|
23/04/2020 | DA/SAFETYEQUIP/2020 | Supply And Delivery Of Safety Equipment |
|
24/03/2020 | | Construction of Ivory Park Public Environment |
|
23/03/2020 | JDA 17/19.2.B 7020 PH2 | Prequalification: Diepsloot Public Environment Upgrade |
|
20/03/2020 | | Construction of Orlando NMT Phase 2 |
|
18/03/2020 | PEU – BRT – CCC SB/002 | RFQ: Construction Of Customer Care Centre, Security Booths, Joubert Street And Ghandi Square |
|
16/03/2020 | JDADF/LEGAL-SECTITLE/2020 | RFQ – Legal Advisory Services On The Sectional Title Programme |
|
11/03/2020 | JDADF/GHANDIMAP/2020 | RFQ: Ghandi Square East Mapping |
|
11/03/2020 | | RFQ: Panel- Town Planners For The Rezoning And Consolidation Of Erf 54-64 MatholesvilleFQ: Ghandi Square East Mapping |
|
05/03/2020 | | Construction of Three Taxi Park and Ride Facilities in Tshepisong |
|
17/02/2020 | | Appointment Of Main Contractor For Brixtonsocial Cluster Phase Two |
|
17/02/2020 | | BRT Customer Care Centres |
|
17/02/2020 | JDA/DFKYA001/2020 | RFQ: Appointment Of Professional Consultants To Conduct Supplementrary Studies For The Township Establishment & Rezoning Of Holding 13 Trevally Ah In Kya Sands Region A For The Development Of The Taxi Holding Facility |
|
02/02/2020 | JDA/DFKY/001/2020 | RFQ – Appointment Of A Town Planner For The KYA Sands To Conduct Supplementary Studies For The Township Establishment And Rezoning Of Holding 13 Trevallyn AH For The Development Of A Taxi Holding Facility |
|
20/01/2020 | | Stormwater Masterplan Implementation SMP |
|
02/12/2019 | DF/LAND0031/2019 | RFP APPOINTMENT OF PANEL PROFESSIONAL SERVICE PROVIDERS-LAND SURVEYORS – 3 YEARS |
|