| PROJECT 6: Beacon Road Upgrade |
|
|
|
| Key documents - Kliptown | ||||||||||
Historical contextThe upgrade of Beacon Road is done in the context of the Tourism and Heritage plan for the area - see Ochre media proposal below: Design approachThe road upgrade in Beacon Road will stretch from Union Road in the North to Gerard Sekoto's house in the South. The upgrade of the streets will involve the planting of indigenous street trees along the sidewalk, providing a shaded environment for the predominantly pedestrian road. The trees are planted in a strip of loose packed stone allowing surface water runoff to permeate the soil around the base of the tree. Traffic calming measures have been introduced across the road at the various nodes with natural stone paving raised to the same level as the sidewalk - smooth surfaces at these nodes allow for ease of pedestrian and wheelchair crossing. The sidewalk is fine tar. Carpobrotus groundcovers will be planted along the length of the sidewalk assisting with erosion and dust pollution. Design elements
Programme |
| HALALA JOBURG | |
|
|
|
| TENDERS | |
| JDA manages large scale construction projects on behalf of the City of Johannesburg. Click here for the latest tenders. | ![]() |
| PHOTO GALLERY | |
| Get a visual overview of JDA projects and developments. click here |
![]() |
| KEY DOCUMENTS | |
| From annual reports to research projects, find all the key documents here. | |
| MEDIA ROOM | |
![]() |
An archive of news on the JDA and its projects. click here |
| FRAUD HOTLINE | |
| The JDA has set up a new fraud hotline: 0800 555 836. click here |
![]() |
| ABOUT THE JDA |
|
|








